Estrella Parcel 58 Forcemain Replacement

City of Goodyear

Existing 4” PVC force main removal, replace with new 4” HDPE DR 11,High line bypass diversion off existing sewer lifts stations, and hardscape replacements.


This project includes the removal of the existing 4-inch PVC force main and installation of a new 4-inch HDPE DR11 force main within the existing pipeline alignment. To install the new HDPE force main, a temporary high line bypass has been installed to divert existing flows in the neighborhood without any required shutdowns or disruptions to residents. Maintaining a seamless new installation while minimizing impacts to the surrounding residents. The project also includes hardscape replacements and a final seal coat application.